Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
Introduction:Notice [2020/11/13 18:15]
jaehyun
Introduction:Notice [2023/02/03 13:48]
hyjeong [Notice]
Line 1: Line 1:
  
  
-[[vialab:​vialab|Back]]+[[http://​vialab.pusan.ac.kr/​doku.php?​id=vialab|Back]]
  
 ===== Notice ===== ===== Notice =====
 +
 +  * [2021-05-27] We participate in the **<color #​241ced>​Color-Modulated Extra-Sensory Perception Technology Research Center</​color>​** (NRF ERC project) from June 2021
 +  * [2021-03-01] We participate in the **<color #​241ced>​AGV control system (ACS) project</​color>​** (partly sponsored by [[https://​www.swhitech.com | Sungwoo HiTech]]) from March 2021.  * [2020-11-23] We participate in **<color #​241ced>​AI Grand ICT Research Center</​color>​** at Dongeui University from Jan. 2021.
 +  * [2020-09-23] We changed our laboratory name to **<color #​ed1c24>​Vehicle Intelligence and Autonomy Laboartory (vialab)</​color>​** to better reflect what we are currently doing in PNU.
 +  * [2020-09-11] We configured our test vehicle for our vehicle positioning research.
 +
 + <​tab>​ {{gallery:​실험차량_센서.jpg?​200|}} ​ <​tab2>​ {{gallery:​실험차량_내부.jpg?​200|}} <​tab2>​ {{gallery:​실험차량_후면.jpg?​200|}}
 +
   * [2019-12-23] <color #​ed1c24>​**Congratulations!**</​color>​ --- The doctoral dissertation of [[http://​nsslab.pusan.ac.kr/​doku.php?​id=Member:​nguyenhoahung |Nguyen Hoa Hung]], titled **"​Cooperative Vehicle Localization,​ Perception, and Routing toward Connected and Autonomous Driving"​**,​ has passed the final defense.   * [2019-12-23] <color #​ed1c24>​**Congratulations!**</​color>​ --- The doctoral dissertation of [[http://​nsslab.pusan.ac.kr/​doku.php?​id=Member:​nguyenhoahung |Nguyen Hoa Hung]], titled **"​Cooperative Vehicle Localization,​ Perception, and Routing toward Connected and Autonomous Driving"​**,​ has passed the final defense.
   * [2019-09-27] We start KOGAS in-line inspection (ILI) robot project work from November, 2019 (5 years). ​   * [2019-09-27] We start KOGAS in-line inspection (ILI) robot project work from November, 2019 (5 years). ​
Navigation